Thank you for taking interest in the Crl Components Inc part number DD101 LONG LEAD, a Capacitor Fixed Ceramic Dielectr product that we stock that is presented alongside the NSN 5910-00-678-8157 for ease of identification. If you would like to learn more about this component and secure purchasing options for your consideration, please fill out and submit the Request for Quote (RFQ) form that is offered below. All we ask is that you supply us with enough information to best accommodate any particular requirements or restrictions that you may have, and we will respond with a curated quote within 15 minutes of our receipt and review.
Note : We Will Not Share Your Information To Any Third Parties.
We strive to ensure that customers only receive precise items of need, opting to arrange our collection by diverse, commonly recognized forms of data. For instance, part number DD101 LONG LEAD specifically traces back to Crl Components Inc through the CAGE Code 71590, a distinct identifier for one of their physical locations. Moreover, with the NSN 5910-00-678-8157, this listing falls within Federal Supply Code (FSC) 5910 Capacitors, enabling one to figure out its basic application. Keeping this in mind, do not hesitate to obtain a competitive quote for part number DD101 LONG LEAD here on Aero OEM Parts at your earliest convenience.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
064-064 | 3 | 9 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX (AIM-54); TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 (C-135E,EC-135H/K/P); MISSILE,AIR-TO-AIR,SPARROW (AIM-7); SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote